Skip to content

Search Results

Filter Site

55 results

Projekt

51. HTL Dornbirn

- HTL Dornbirn In spring 2020, the chemistry department on the 2nd floor of the HTL Dornbirn was turned into a construction site. After months of work, the time has finally come – the new laboratories…
Projekt

52. Taborland Shopping Center Steyr

- Taborland Shopping Center Steyr The approximately 40-year-old Taborland shopping center was demolished and redesigned by Weiß Handels GmbH after it was acquired by the Rutter Immobilien Group. The…
Projekt

53. Albern Haven – San Cargo

- Albern Haven – San Cargo Construction project Albern Haven – San Cargo office buildings In July, 2020, the IAT GmbH Greenline, the department for suction and vacuuming technology, got the contract…
Projekt

54. A11 Karawanken Tunnel

- A11 Karawanken Tunnel The existing Karawanken tunnel, a border tunnel between the Republic of Austria and Slovenia on the A11 Karawanken motorway, has a total length of 7.9km. 4,441m of the tunnel…
Projekt

55. Sealing Wienerwald Tunnel

- Sealing Wienerwald Tunnel While expanding the west track section, the new Wienerwald Tunnel arose between the city border of Vienna and Lower Austria. The approximately 13.35 km railway tunnel runs…
Search results 51 until 55 of 55